WE WILL SOON BE BUILDING OUR NEW SHELTER
It will cover an area 117 metres x 80 metres excluding the Car Park area.

It will contain:

71 pens with runs 3m x 7m
4 Puppy Pens
9 Poodle & Terrier Pens
8 Boarding Pens
4 In-season Pens
4 Quarantine Pens
8 Excercise Compounds
Central corridors for access to pens, kennels and cleaning
Clinic for operations, 3 Recovery Pens, Dog Shower & Grooming
Visitor Centre
Office
Staff Room, Toilets & Shower
Coffee Area
Maintenance Workshop & Store
Central Building for Dog Food storage & preparations, Washing-up, Freezers
Access Road to Centr Building
2 metre wide walkway
Vehicular access to all compounds for maintenance
4 Dog Deposit kennels (inaccesible from the front once a dog has been put in)
Incinerator
Generator Room & Switch Room
Pet Rememberance Garden (later)

COST OF PROJECT INCLUDING LAND PURCHASE CY£195,000
 
ONLY £10,000 MORE TO RAISE!
     
 
Picture of Model built by Don Hawes from a design by Keith Miller. Architect Andre Locke.
Some slight additions and alterations have been made since the model was built but the Architect's Drawings remain fundamentally the same.
The Administration Buildings are already built and await transportation from Nicosia.